PS Digitise
✦ Frappe Partner Free Consultation →
🧵 Textile & Apparel · Yarn · Fabric · Garments · Tiruppur · India

ERPNext for Textile & Apparel Manufacturers — Yarn to Garment, One System.

PS Digitise implements ERPNext for textile and apparel manufacturers — yarn spinning mills, fabric producers, garment exporters and home textile companies. Colour × size item variants, multi-stage BOM, cutting wastage tracking, dyeing job work with ITC-04, export IGST and piecework payroll. Fixed price. 8-week go-live.

✓
Colour × size variants — 50 SKUs under one item code, no SKU explosion
✓
Cutting wastage tracked per Work Order — reduced from 8% to 5.2%
✓
Dyeing job work ITC-04 — from 2 days to 45 minutes per quarter
✓
WIP visible at every stage — yarn, grey fabric, finished fabric, garment
✓
Export IGST and shipping bill tracked — duty drawback claim support
50+ implementations · India
From ₹1,75,000 · fixed price
8 weeks go-live
₹0 software licensing
ERPNext · Stock › Stock Balance · Polo Shirt Style A2 Variants
Variants Active
Item Variants — Polo Shirt Style A2 · Colour × Size · Oct 2026
Colour ↓ / Size →
XS
S
M
L
XL
Navy Blue
24
48
60
36
18
White
12
36
8
24
12
Black
0
6
42
54
30
Red
0
0
4
18
12
20
Variants (4×5)
1
Item code
Live
Stock per variant
Low ⚠
3 variants
Problems we fix for textile and apparel manufacturers

Six problems every textile and garment manufacturer in India faces.
ERPNext fixes all of them.

Textile manufacturing has unique complexity — colour and size combinations, multi-stage production from yarn to garment, dyeing job work compliance and export GST. ERPNext handles all of it natively.

❌ Right now
10 colours × 5 sizes = 50 separate item codes to manage. Excel explodes. Stock balance per colour-size combination unknown. Reorders missed on specific combinations.
✓ After ERPNext
Item Variants — one base item with colour and size attributes. 50 variants under one item code. Stock, price and reorder per variant. One BOM for all variants.
No SKU explosion
❌ Right now
Cutting wastage unknown. Actual fabric consumption per style always higher than BOM. Margin erosion discovered at year-end. No per-style wastage data to act on.
✓ After ERPNext
Cutting allowance in garment BOM. Actual fabric issued vs consumed tracked per Work Order. Wastage posted to Cutting Loss account. Trend report per style — 8% → 5.2%.
35% wastage reduction
❌ Right now
Multi-stage WIP — yarn in spinning, grey in weaving, fabric in dyeing, garments in stitching — all tracked in different Excel files. No end-to-end WIP visibility.
✓ After ERPNext
Each production stage as a Work Order in ERPNext. WIP visible at every stage simultaneously. MD sees yarn, grey, fabric and garment WIP on one dashboard.
End-to-end WIP visible
❌ Right now
Dyeing and weaving job workers — challans on paper, ITC-04 filing takes 2 days of hunting. Open challans older than 180 days creating GST risk undetected.
✓ After ERPNext
Every dyeing and weaving challan tracked. ITC-04 Tables 4 and 5 auto-prepared. Open challan ageing flags 180-day risk. Filing time: 45 minutes, not 2 days.
ITC-04 in 45 min
❌ Right now
Export orders — IGST refund, duty drawback and shipping bill tracking in separate Excel. Refund claims delayed. Export GST incorrect on GSTR-1. Revenue loss.
✓ After ERPNext
Export Sales Invoice with IGST, shipping bill number, port and let export date. GSTR-1 EXPWP/EXPWOP correctly filed. Duty drawback reference tracked per export.
Export IGST correct
❌ Right now
Piecework payroll for tailors — pieces completed calculated in Excel, linked to daily wages manually. Errors every month. Tailor disputes. 3 days payroll preparation.
✓ After ERPNext
Job Card captures pieces completed per tailor per shift. Piecework wage auto-calculated from Job Card. Links to Frappe HRMS payroll. Payroll preparation in 2 hours.
Piecework payroll auto
End-to-end textile production flow

From yarn procurement to garment export — every step connected in ERPNext.

Every production stage updates WIP, stock and accounts simultaneously. No separate Tally entry. No Excel stage tracker. No manual cost sheet.

1
Yarn and Raw Material Procurement
PO → GRN → QC → Stock
1
🧵
Yarn Purchase Order
Count, ply, composition, shade. Supplier PO with quality spec.
Count + ply + shade
2
🚛
Yarn GRN
Lot number, cone count, weight captured. Quality inspection. Released to yarn store.
Lot + QC
3
📦
Fabric and Trim Procurement
Fabric by composition, width and shade. Trims — buttons, zippers, labels by style.
Fabric + Trims
4
💰
FIFO Valuation
Yarn and fabric valued at FIFO — fluctuating cotton prices reflected accurately in COGS.
FIFO for yarn
2
Production — Multi-stage Manufacturing
Weaving → Dyeing → Cutting → Stitching
5
🏭
Weaving Work Order
Yarn issued to weaving. Grey fabric output. Weaving efficiency tracked per loom.
Grey fabric output
6
🔧
Dyeing Subcontracting
Grey fabric sent to dyeing job worker. Challan raised. ITC-04 tracking starts.
ITC-04 challan
7
✂️
Cutting Work Order
Fabric issued to cutting. Actual fabric consumed and cutting wastage recorded. Wastage posted.
Cutting loss tracked
8
🪡
Stitching — Job Cards
Piecework — pieces completed per tailor per shift in Job Card. Wage auto-calculated.
Piecework + HRMS
3
Dispatch and GST Compliance
Domestic + Export → GSTR-1 → ITC-04
9
📊
Style-wise costing
Yarn + fabric + job work + trims + labour per style. Actual vs budgeted margin per style report.
Style margin live
10
📤
Delivery Note + e-Way Bill
Domestic dispatch — Delivery Note. e-Way Bill for goods above ₹50,000 from ERPNext.
e-Way Bill auto
11
🌍
Export Invoice + Shipping Bill
Export Sales Invoice with IGST. Shipping bill number, port, let export date all recorded in ERPNext.
Export IGST · EXPWP
12
📋
GSTR-1 + ITC-04
Domestic B2B, B2CS and export EXPWP all in GSTR-1. ITC-04 from dyeing/weaving challans. Both in under an hour.
Both in 1 hour
ERPNext modules for textile and apparel

Every module your textile business needs — at ₹0 licensing.

All modules below are included in the base ERPNext licence. No per-style or per-variant charge.

Colour × Size Item Variants — no SKU explosion
ERPNext Item Variants eliminate the colour-size explosion problem. One base item — Polo Shirt Style A2 — with colour (10) and size (5) as variant attributes. All 50 variants are managed under one item code with their own stock, price and reorder level. One BOM covers all variants. No 50-row item master.
✓
One base item per style — colour and size as variant attributes. All 50 combinations under one item code.
✓
Stock per variant — live balance per colour-size combination. Low stock flagged per specific variant.
✓
Price list per variant — export price vs domestic price per colour-size. Customer-specific pricing supported.
✓
Reorder per variant — minimum stock and reorder quantity per colour-size combination
✓
One BOM for all variants — fabric and trim requirements same across sizes with adjustment factors
ERPNext · Items › Polo Shirt Style A2 · Variants
20 Variants Active
Item Variants — Polo Shirt Style A2 · Stock balance per colour-size
Variant (Colour + Size)Current StockReorder LevelStatus
Navy Blue · M60 pcs30 pcsOK
White · M8 pcs30 pcsBelow Reorder
Black · S6 pcs30 pcsBelow Reorder
Red · XS0 pcs20 pcsOut of stock
20
Active variants
1
Item code
3
Reorder alerts
Multi-stage BOM — yarn to grey fabric to finished fabric to garment
ERPNext supports multi-stage production BOM for the complete textile value chain. Each stage has its own BOM — yarn to grey fabric (spinning/weaving), grey to finished fabric (dyeing/processing), finished fabric to garment (cutting and stitching). WIP is tracked at every stage.
✓
Stage 1 BOM — yarn (count, ply) to grey fabric (weave, width, composition). Yarn consumption per metre of grey.
✓
Stage 2 BOM — grey fabric to finished fabric after dyeing, printing or embroidery job work
✓
Stage 3 BOM — Garment — finished fabric per garment + trims (buttons, zippers, labels, thread). Cutting allowance included.
✓
WIP at every stage — quantity in spinning, weaving, dyeing, cutting and stitching all visible simultaneously
✓
Actual vs standard at each stage — weaving efficiency, dyeing yield, garment cutting wastage all tracked against standard BOM
Cutting wastage tracking — per Work Order, per style
The garment BOM in ERPNext includes a cutting allowance for each style — the standard fabric consumption per piece including expected wastage. When a Work Order is raised and fabric is issued, actual consumption is recorded. The difference between issued and consumed is cutting wastage — posted to a Cutting Loss account.
✓
Cutting allowance in BOM — standard fabric per piece including 5–10% wastage configured per style
✓
Actual fabric consumed per Work Order — recorded at cutting stage. Difference = cutting wastage.
✓
Cutting Loss account — wastage posted to P&L account. Visible in monthly reports.
✓
Style-wise wastage trend — improvement or deterioration per style per month. Actionable data for production managers.
✓
PS Digitise client result — cutting wastage reduced from 8% to 5.2% in 3 months using ERPNext trend data
ERPNext · Manufacturing › Work Order · WO-0284 · Polo Shirt Style A2
Cutting stage
Cutting Work Order — Polo Shirt A2 · 500 pcs · Oct 2026
ItemBOM Qty (standard)Issued (actual)ConsumedWastage
Cotton Jersey 180 GSM (Navy)210 m210 m194 m16 m (7.6%)
Collar Fabric (Rib)30 m30 m28.5 m1.5 m (5.0%)
7.6%
Cutting wastage (actual)
5.0%
Standard BOM target
+2.6%
Variance — action needed
Dyeing and weaving subcontracting — ITC-04 from ERPNext
Every dyeing, weaving, printing or embroidery challan raised when fabric leaves the factory for a job worker is tracked in ERPNext. Material returns close the challan. ITC-04 Tables 4 and 5 auto-prepare at quarter-end. Open challan ageing flags any challan approaching 180 days.
✓
Subcontracting Order — fabric quantity to send, process (dyeing, printing, embroidery), expected return date
✓
Delivery Challan — fabric despatched to job worker. Challan number, date, quantity and job worker recorded.
✓
Subcontracting Receipt — finished fabric received. QC inspection. Accepted qty to fabric store. Rejected → return challan.
✓
ITC-04 auto-prepared — Tables 4 and 5 from challan data. Ready to file in 45 minutes per quarter.
✓
Open challan ageing report — challans approaching 180-day limit flagged. ITC reversal risk avoided.
ERPNext · Manufacturing › Subcontracting Challan Tracker · Q2 FY27
ITC-04 Ready
Dyeing Subcontracting Challans — Jul–Sep 2026
ChallanDyerFabricSentReturnedStatus
SC-0441Sri Murugan DyeingCotton Jersey 200m2 Jul15 JulClosed
SC-0458Ravi Colour WorksPolyester 180m1 Aug—Open · 81 days
SC-0472Selva Print HouseCotton Voile 150m5 Sep—Open · 46 days
45 min
ITC-04 filing time
1 ⚠
Near 90-day alert
Auto
Tables 4 & 5
Export GST — IGST, shipping bill and EXPWP in GSTR-1
Export Sales Invoices in ERPNext carry IGST (for export with payment of tax), shipping bill number, port of export and let export date. GSTR-1 EXPWP (export with payment) section is auto-populated from these invoices. Duty drawback claim reference tracked per export invoice.
✓
Export Sales Invoice with IGST — tax type set to IGST on export invoices. Rate per item (12% for garments above ₹1,000).
✓
Shipping bill details — shipping bill number, port of export (Chennai / Tuticorin / JNPT), let export date recorded per invoice
✓
GSTR-1 EXPWP section — export invoices auto-populated in GSTR-1 exports section. JSON export for portal.
✓
Duty drawback reference — custom field for drawback claim number per export invoice. Claim tracking in ERPNext.
✓
e-Way Bill for domestic dispatch — for goods above ₹50,000. Generated from Delivery Note via India Compliance app.
Style-wise costing — actual margin per style, live
ERPNext captures every cost element per style — yarn, fabric, dyeing job work, trims, cutting wastage and stitching labour. The Style-wise Costing report compares actual cost vs budgeted cost and shows actual margin per style per order. No month-end Excel cost sheet needed.
✓
Fabric cost per style — actual fabric consumed tracked in Work Order. Variance vs BOM standard.
✓
Job work cost per style — dyeing, printing and embroidery costs from Subcontracting Receipt per style
✓
Labour cost per style — piecework from Job Cards per tailor per style. Allocated to style cost.
✓
Trim cost per style — buttons, zippers, labels and thread from BOM. Actual vs standard per order.
✓
Actual margin per style — selling price minus all actual costs. Profitable and unprofitable styles visible immediately.
ERPNext vs alternatives for textile manufacturers

Why textile and garment manufacturers in India choose ERPNext over Tally and standalone textile software.

Standalone textile software handles production but not accounts. Tally handles accounts but not variants or BOM. ERPNext does everything at ₹0 licensing.

RequirementERPNext + PS DigitiseTally PrimeStandalone Textile Software
Colour × size item variants✓ Native · one item code · 50 variants✗ Separate item per variant✓ Most textile solutions
Multi-stage BOM (yarn to garment)✓ 3+ stage BOM · WIP at every stage✗ Not available✓ Core feature
Cutting wastage tracking per Work Order✓ Actual vs standard · P&L posting✗ Not availableSome products
Dyeing/weaving subcontracting + ITC-04✓ Native · challan tracking · auto ITC-04✗ Paper challan onlyVaries — often basic
ITC-04 filing time45 minutes — auto-prepared2–3 days — manualStill manual in most
Export GST — IGST + shipping bill✓ EXPWP in GSTR-1 · shipping bill tracked✓ NativeVaries
Style-wise actual costing✓ Fabric + job work + labour + trims✗ Manual Excel cost sheetSome products
Accounts + P&L integrated✓ Perpetual inventory — no separate Tally✓ Accounting-firstExport to Tally required
5-year software cost₹0 — open source₹18,000/year₹60,000–₹1,50,000/year
Implementation costFrom ₹1,75,000 · fixed priceN/A₹1,00,000–₹3,00,000
Client results

Textile and apparel manufacturers — real results after ERPNext.

35%
Cutting wastage reduction · 8% → 5.2% in 3 months
"We never knew our exact cutting wastage per style. ERPNext showed 8% average. By tracking per Work Order, we brought it to 5.2% in 3 months."
Garment Manufacturer · Tiruppur · 200 machinesProduction Head · ERPNext Work Orders + Cutting Wastage
One screen
WIP across all stages · yarn to garment visible
"Yarn in spinning, grey in weaving, fabric in dyeing, garments in stitching — all visible in one ERPNext screen. First time in 15 years we had this."
Integrated Textile Mill · Tamil NaduMD · ERPNext Phase 1 + Manufacturing · Full value chain
45 min
ITC-04 for dyeing job workers · down from 2 days
"Dyeing challans used to be paper records. ERPNext tracked every challan. ITC-04 prepared in 45 minutes at quarter-end — first time we filed on time without panic."
Fabric Manufacturer · Erode · 5 dyeing job workersAccounts Manager · ERPNext Subcontracting + ITC-04
Fixed price · No surprises · 2026

ERPNext software: ₹0 forever. PS Digitise implements it — fixed price.

ERPNext is open source — ₹0 licensing. The prices below are PS Digitise's implementation fee. Price confirmed in writing before we start.

Phase 1 — Accounts + Inventory + GST
₹1,75,000
8–10 weeks · one-time
Item variants — colour and size setup
Yarn and fabric item masters with HSN codes
Multi-warehouse — yarn, grey, fabric, FG garment
Dyeing subcontracting challans and ITC-04
GST — domestic and export IGST
GSTR-1 with EXPWP for export invoices
Tally data migration — zero data loss
1 month post-launch support
Hosting and AMC
From ₹410/mo
Ongoing · after go-live
Frappe Cloud managed hosting — India data centre
Daily backups, SSL and auto-upgrades
AMC ₹50,000/year — support + minor fixes
Priority WhatsApp support Mon–Sat
Common questions

Questions textile and apparel manufacturers ask before implementing ERPNext.

Can ERPNext handle colour and size variants for garments without creating 50 item codes? +
Yes. ERPNext Item Variants allow a single base item — for example, Polo Shirt Style A2 — with colour and size as variant attributes. 10 colours × 5 sizes = 50 variants are managed under one item code. Each variant has its own stock balance, price list and reorder level. The garment BOM is written at the base item level and covers all variants. One item code, one BOM, 50 combinations — no SKU explosion in the item master.
How does ERPNext track cutting wastage in garment manufacturing? +
The garment BOM in ERPNext includes a cutting allowance — the standard fabric consumption per piece including expected wastage percentage. When a Work Order is raised and fabric is issued to the cutting department, the actual fabric consumed is recorded at Work Order completion. The difference between issued and consumed is the cutting wastage — posted to a Cutting Loss account in the P&L. A trend report shows wastage percentage per style per month, giving production managers actionable data to reduce wastage systematically.
Can ERPNext handle ITC-04 for dyeing and weaving job workers? +
Yes. ERPNext's Subcontracting module tracks every challan raised when grey fabric or yarn is sent to a job worker for dyeing, weaving, printing or embroidery. Material returned from the job worker closes the challan in ERPNext. At quarter-end, the ITC-04 report auto-prepares Tables 4 and 5 from these challan transactions. Open challan ageing report flags any challan approaching 180 days before the ITC reversal risk triggers. Filing time reduces from 2 days of manual paper challan hunting to 45 minutes.
How does ERPNext handle export GST for garment exporters? +
Export Sales Invoices in ERPNext are configured with IGST (for export with payment of tax) or zero-rated (for export under bond or LUT without payment). The invoice carries shipping bill number, port of export (Chennai, Tuticorin, JNPT) and let export date as custom fields. GSTR-1 EXPWP section is auto-populated from these invoices. Duty drawback claim reference is tracked per export invoice. JSON export to GST portal includes the complete export data.
What does ERPNext cost for a textile or garment manufacturer? +
Phase 1 (accounting, inventory with item variants, dyeing subcontracting, ITC-04, export GST) from ₹1,75,000. Full implementation adding multi-stage BOM, Work Orders, cutting wastage tracking, style-wise costing and Frappe HRMS piecework payroll from ₹2,75,000. ERPNext software: ₹0 licensing forever. Frappe Cloud hosting from ₹410/month. Tally migration free. All prices fixed in writing before we start.
Can ERPNext manage piecework payroll for tailors and loom operators? +
Yes. Job Cards in ERPNext capture the number of pieces completed per tailor per shift per operation. This data feeds into Frappe HRMS where the piecework wage is calculated at the configured rate per piece per operation. The piecework component is added to the monthly salary slip automatically. Shift-based attendance tracking, overtime calculation, PF, ESI and PT payroll are all included in Frappe HRMS — one system from Job Card to payslip.
Deep-dive guides

Read more about ERPNext for textile and apparel.

Free Assessment · Fixed Price · 8-Week Go-Live

Ready to bring your textile business onto one ERP system?

Free 30-minute call with our textile ERP specialist. Written fixed-price quote in 48 hours. Tally migration free. Trial Balance guaranteed before go-live.

WhatsApp